    A new build does not need every decision at once.

    Orla
    Orla
    Interior Designer, Dublin · 9 min read

    Published 15 November 2026

    A new build does not need every decision at once. It needs the right decisions before each deadline. This is my checklist for separating the choices that shape the house from the purchases that can wait.

    The short answer: plan the fixed choices before the finishing touches

    Before choosing finishes for a new build, confirm what is included, ask for the builder's selection deadlines and draw a furniture layout. Then coordinate the kitchen, flooring and bathroom finishes, and check lighting and socket positions where changes are permitted. Leave cushions, decorative accessories and non-essential furniture until the room's dimensions and main pieces are settled.

    A developer-built home and a self-build are different projects. In an estate home you may have a small menu of finishes and no permission to move electrical points. In a self-build you may have more control, but your architect, builder and trades still need to approve technical decisions. Neither situation calls for choosing a whole house from isolated showroom samples.

    I would start with three documents: the current specification, a dimensioned plan and a decision list showing the deadline, cost and person responsible for each choice. Those give you something far more useful than another folder of inspirational photographs.

    Ask the builder these questions before you spend

    Included finishes
    Which rooms receive flooring, wall tiles, paint, light fittings and fitted storage? Get product references and quantities, not simply descriptions such as premium flooring. Showhouse styling is not evidence of what your contract includes.
    Choice deadlines
    When must kitchen, tile, floor and electrical selections be signed off? Which choices are still changeable, and what happens if you miss a deadline? Ask about approval dates separately from expected handover.
    Upgrade costs
    Is the quoted upgrade price the extra cost above the standard allowance, or the full replacement price? Does it include fitting, VAT, delivery, preparation and making good? Ask for the full change in writing.
    Measurements
    Are the drawings marketing plans or dimensioned construction drawings? When can a supplier measure the finished room? Do not order made-to-measure curtains or a wall-to-wall cabinet from a brochure sketch.
    Aftercare
    What are the instructions for ventilation, heating, decorating and fixing into walls? Where are concealed services recorded? Ask who you contact about snagging and how later alterations might affect your warranty.

    Keep the answers in a shared note rather than across texts and emails. An agreed specification makes it much easier to distinguish an interior design preference from something the builder has not delivered.

    Draw the furniture before agreeing sockets and pendants

    Mark doors, windows, radiators, kitchen units and routes through the room first. Add the sofa, dining table, beds and storage at their real dimensions. You do not need to choose a brand yet, but you do need a credible size and position. A socket can look sensible on an empty wall and disappear behind the only place the sofa fits.

    Walk through an ordinary evening. Where will you charge a phone, plug in a table lamp, work on a laptop or vacuum the stairs? At a bed, check both sides rather than placing one socket behind the headboard. At a television, consider power and connections together, and how cables will reach them without trailing across a doorway.

    A dining pendant should relate to the dining table, not automatically the centre of the room. If the table position is still uncertain, avoid committing to a decorative fitting that only works in one spot. Your electrician should confirm wiring, mounting, clearances and suitability; the furniture plan is the brief, not an electrical installation drawing.

    If the developer cannot change points, design around what exists. A floor lamp beside a sofa and a table lamp on a sideboard can improve an evening room without rewiring it. Do not let a preference for wall lights turn into an unplanned building project.

    Choose kitchen and flooring samples together

    Put the cabinet sample, worktop, floor and tile on one board and view them together. A cream cabinet can become yellow beside a blue-grey floor. A heavily patterned worktop can become busy beside equally active floor grain. The question is not whether each sample is lovely. It is whether the combination has a clear lead material and enough quieter surfaces around it.

    Look in daylight and with the light you expect to use in the evening. Hold samples in their eventual orientation: worktops and floors flat, cabinet fronts upright. If access to the house is unavailable, make a provisional choice and confirm the supplier's change policy rather than treating a phone photograph as a colour match.

    Ask the flooring supplier about the complete system: product, underlay or adhesive, subfloor preparation, moisture testing, thresholds and fitting. With underfloor heating, compatibility is product-specific. Quick-Step's installation guidance distinguishes between wood, vinyl and laminate systems; a label saying suitable for underfloor heating is not a substitute for the exact product's instructions.

    A visually continuous floor can help connected rooms feel calm, but do not promise yourself a threshold-free finish without installer approval. Expansion requirements, wet areas, floor levels and the layout may require joints or transitions. Good detail is making those transitions intentional, not pretending the technical requirements do not exist.

    Decide which upgrades earn their place

    I would judge an upgrade against four questions: will you use it daily, is it difficult to change later, does it solve a clear problem, and what else will that money prevent you buying? A drawer arrangement that makes the kitchen easier to use may matter more than a more expensive decorative splashback.

    Illustrative example: one homeowner needs accessible kitchen storage and a clear worktop for family cooking. Another cooks rarely but works at the dining table every day. Their worthwhile upgrades will not be the same, even with identical floor plans. Prioritise the behaviour, not a universal list of premium finishes.

    Keep standard finishes that work with your scheme. Upgrading every tap, handle and tile can consume the budget while leaving you without comfortable seating or bedroom privacy. Equally, do not save on a specification you know is unsuitable and assume you will replace it cheaply later. Compare the installed cost and disruption of changing it now versus after moving in.

    For bathrooms, confirm practical details with the installer: wet-area suitability, slip performance where relevant, cleaning, grout choice and access to service valves. Choose the visual direction, but leave waterproofing and technical specification to the qualified professional responsible for them.

    Make storage fit the routines, not just the wall

    The entrance needs a landing place for coats, shoes, keys and bags. Decide whether a bench will leave enough walking space and whether cupboard doors can open without colliding with the front door. An impressive hall photograph is not a useful design if four pairs of shoes have nowhere to go.

    In the kitchen, check bins, trays, cleaning supplies and the appliances you leave out. In a bedroom, list what needs hanging versus drawers before choosing a wardrobe interior. In a small spare room, decide whether it is primarily an office or primarily a guest room; trying to give both functions permanent full-size furniture often compromises both.

    Delay expensive bespoke joinery if you do not yet understand how you will use the space. A freestanding cabinet can test the position first. For any permanent fixing, identify the wall construction and hidden services, and have the right fixings and installation confirmed.

    What can wait until you have the keys?

    Final paint selection can often wait until you have seen the room's real daylight, provided you are not holding up agreed works. Test generous samples beside the chosen floor, not little swatches in an empty corner. Follow the builder's decorating instructions before applying specialist finishes or wallpaper.

    New construction contains moisture and may continue drying after handover. NHBC's new-home guidance explains the role of heating and ventilation during that period. It is UK guidance, not an Irish warranty rule; the instructions for your own home take priority. There is no single safe waiting period for every house, substrate and wall covering.

    Small tables, cushions, artwork and decorative objects can wait until the larger pieces are positioned. Bedroom privacy, a bed and mattress, safe lighting and a place to eat cannot. The aim is a workable home first, not a showroom completed on moving day.

    For the sequence after handover, read my guide to decorating a new house in Ireland. For choosing quantities and controlling spend, use the furnishing budget guide linked below.

    Your final sign-off checklist

    Scope
    Confirm the specification, exclusions and the decisions the builder permits.
    Layout
    Put realistically sized furniture on the plan and check doors, chairs and routes.
    Samples
    Compare kitchen, floor, worktop and tiles together in more than one light.
    Technical checks
    Ask the relevant trade to approve heating compatibility, preparation, mounting and installation.
    Costs
    Record the total installed price, payment terms and what is being removed from the standard allowance.
    Handover
    Obtain care instructions, confirmed measurements and the aftercare contact before booking irreversible decoration.

    If you want my help, send the plans, the specification and your next decision deadline with your enquiry. The Design Edit is €149 for a one-hour consultation and written action plan. A whole-home scope is agreed separately through The Signature Home Edit, with price on enquiry; the consultation is not a complete technical drawing package for the house.

    FAQ

    Frequently asked

    When should I involve an interior designer in a new build?+
    Before the next decision you cannot easily reverse, such as a builder's kitchen or finish selection deadline. Bring a current plan, specification and budget. If those choices are already fixed, design help can still address furniture, colour, lighting fittings and how rooms work together.
    Should I choose flooring or paint first?+
    Coordinate the flooring with other fixed finishes first, then test paint beside the chosen materials in the room. Paint is usually easier to adjust than an installed floor. The order of installation should be agreed with the trades, not inferred from the order of colour selection.
    Can I change sockets in a developer-built new home?+
    Only if the developer permits it and the electrical work can be approved and completed by the appropriate professional. Ask before designing around a change. If the positions are fixed, use furniture placement and plug-in lighting to work with them.
    Can I wallpaper a new build straight away?+
    Do not assume so. Ask the builder and wallpaper supplier about drying, substrate preparation and decorating restrictions for your home. Construction moisture and movement vary, so a fixed wait of a few weeks or months is not a reliable rule for every property.
    Do I need to upgrade the builder's standard kitchen?+
    Not automatically. Keep standard finishes that suit your needs and palette. Consider an upgrade when it solves a daily practical problem or avoids a difficult later change, and compare the full installed cost with the other essentials your budget must cover.

    The best moment to ask for help is before the deadline, not after the expensive order. Bring me the choices you are being asked to make, and we can work out which ones deserve your attention first.

    Technical references

    Work with Orla

    Bring it into your own room.

    I design real Irish homes: in person across Dublin, or remotely by photo.

    Just need a steer
    The Design Edit
    €149

    A one-hour consult on your room, with a written plan to build it yourself.

    Book a consult →
    Most popular
    The Room Edit
    €249

    Your whole room designed and made shoppable: layout, palette, furniture, and a list you just order from.

    Design my room →
    Two connected rooms
    The Home Edit
    €449

    Two connected rooms, designed to flow together as one home.

    Design my home →
    Orla, interior designer
    Orla, interior designer
    Based in Dublin, working across Ireland and remotely · 550+ rooms reimagined so far
    Book a free 15-min call →

    Free · 2 minutes

    See your room, restyled.

    Send one photo and see your own room rendered in a style that fits you.

    Start the free quiz →